Production systems practice questions.

33 exam-style questions on Production systems — topic B4.1 of Design in practice in the IB Design Technology syllabus — with answers and explanations. Samples below; the full set is free with an account.

At a glance

About this topic

Syllabus code
B4.1
Subject
IB Design Technology
Theme
B · Design in practice
Questions
33 with worked answers
Question types
12 multiple-choice questions · 6 flashcards · 6 fill-in-the-gap questions · 3 matching tasks · 2 diagram tasks · 2 true/false questions · 1 essay question · 1 structured question
Try it

Sample questions on Production systems

A smelting plant holds its reduction cells molten day and night and never shuts them down: letting the bath freeze would cost weeks of work and a rebuild of the cell lining before any output could restart. Which production system does this describe?

  • Continuous production
  • Mass production on a dedicated assembly line
  • Batch production with unusually long runs
  • Cellular manufacture of one product family

Answer: Continuous production

Continuous production is defined by a process that is not interrupted because starting and stopping is what costs the money, not by the annual volume alone. A mass production line makes the same high volume but can be stopped at the end of a shift and started again the next morning at little cost.

On an assembly line each operator checks and signs the torque figure recorded at the previous station before starting their own operation, and a supervisor audits the record sheets each week. This arrangement is best described as:

  • Quality control by final inspection
  • Statistical sampling of finished goods
  • A tolerance specification for the joint
  • Quality assurance within the process

Answer: Quality assurance within the process

Quality assurance is the set of procedures that stop a fault being produced, and checking the previous operation acts before value is added. Quality control works the other way round, detecting faults in items that have already been made.

A boatyard builds twelve 14 m sailing hulls a year. Each hull stays on its cradle from start to finish while joiners, electricians and painters come to it in turn. Which factory layout is described?

  • Product (line) layout
  • Process (functional) layout
  • Cellular layout
  • Fixed-position layout

Answer: Fixed-position layout

When the product is too large or too heavy to move economically, the work stations travel to it instead, which is fixed-position layout. Line, process and cellular layouts all assume the part moves between operations.

A bicycle assembler moves to just-in-time delivery of tyres from a single overseas supplier. Which consequence follows most directly?

  • Buffer stock falls, so a late shipment halts assembly
  • The raw material store must be enlarged to hold the tyres
  • Inspection of incoming tyres becomes unnecessary
  • The line can run longer batches between changeovers

Answer: Buffer stock falls, so a late shipment halts assembly

Just-in-time delivery exists to drive inventory towards zero, so there is no buffer left to absorb a disruption in supply. Treating JIT as a warehousing strategy inverts its whole purpose.

A programme needs 6000 aluminium pump bodies in total. Die casting needs a 60000 dollar tool and then costs 4 dollars a body; machining from billet needs no tool and costs 12 dollars a body. Machining is chosen. Identify the single change to the brief that would make die casting the cheaper route.

  • Reducing the machining cost to 11 dollars a body
  • Cutting the tool cost by 5000 dollars
  • Raising the programme quantity above 7500 bodies
  • Splitting the programme into six runs of 1000 bodies

Answer: Raising the programme quantity above 7500 bodies

The two routes cost the same when 60000 + 4n = 12n, that is at n = 7500 units, so only a quantity above that figure turns the decision. At 6000 units machining costs 72000 dollars against 84000; an 11 dollar machining rate still gives 66000 against 84000, and 55000 of tooling still gives 79000 against 72000.

A plant automates an assembly operation that runs six product variants in short runs, and the labour cost per unit falls as expected. Identify the cost that rises most directly because the runs are short.

  • The cost of changing the cell over between variants
  • The material cost of each finished unit
  • The cost of inspecting each unit at the end of the line
  • The energy used to light and heat the building

Answer: The cost of changing the cell over between variants

Automation buys a low cost per unit at the price of a long set-up: tooling, fixtures and programs must be exchanged and proved for every variant, and with short runs that cost is spread over few units. This is the standard trade-off of automation, and it is why flexible equipment is preferred where the mix changes often.

That was 6 of 33 Production systems questions.

Practise all 33 free
Exam tips

Command terms in this topic

Keep going

More topics in Design in practice

All of Design in practice →

33 Production systems questions — free with an account. Spaced repetition, streaks and full exam simulations included.

Practise them free

This platform is independently developed and is not endorsed by, affiliated with, or sponsored by the International Baccalaureate Organization. “International Baccalaureate” and “IB” are registered trademarks of the IBO.